P 310026Z MAR 01
FM COGARD MSD CORAM NY
TO CCGDONE BOSTON MA//M/CC//
COMDT
COGARD WASHINGTON DC//G-MRO//
COMCOGARD NPFC WASHINGTON DC
COMCOGARD MLC
LANT NORFOLK VA//FCP//
COGARD MSO LONG ISLAND SOUND NEW HAVEN
CT
COMCOGARDGRU LONG ISLAND SOUND NEW HAVEN CT
COMCOGARDGRU MORICHES
NY
COMCOGARDACT NEW YORK NY
BT
UNCLAS //N16465//
SUBJ: POLREP EIGHT, MINOR,
T/B RHODE ISLAND SPILL, NORTH SHORE, LONG
ISLAND, MC01003947.
1.
SITUATION:
A. GROUP/MSO LONG ISLAND SOUND RESUMED MONITORING CLEAN UP AT
0600.
OPERATIONS WERE CONCENTRATED IN PORT JEFFERSON HARBOR, OLD
FIELD
BEACH, AND WEST MEADOW BEACH, NY.
B. ESTIMATE APPROXIMATELY 22 MILES
OUT OF THE ORIGINALLY ESTIMATED 25
CLEANED OF OIL. EASTERN AREA, FROM CEDAR
BEACH EAST TO WILDWOOD STATE
PARK IS DESIGNATED AS CLEAN, AND HAVE BEEN
REVIEWED BY JOINT CG AND
NYS DEC ASSESSMENT TEAMS. WESTERN AREA,
EXPERIENCED RE-OILING IN
NORTHERN WEST MEADOW BEACH, CRANE NECK, FLAX POND
AND MCALLISTER PARK.
SOUTHERN WEST MEADOW BEACH AND OLD FIELD BEACH WERE
DESIGNATED AS
CLEAN TODAY. PROGRESS WAS MADE WITHIN THE SE END OF PORT
JEFFERSON
HARBOR DESPITE ABOVE NORMAL HIGH TIDES.
C. PLANS FOR 31MAR01
CONSIST OF RE-EVALUATION OF AFFECTED AREAS.
CLEAN UP EFFORTS WILL BE
CONCENTRATED IN FLAX POND, PORT JEFFERSON
HARBOR, AND OLD FIELD BEACH.
RE-OILED SECTIONS OF MCALLISTER PARK AND
WEST MEADOW BEACH WILL BE REVIEWED
BY ASSESSMENT TEAMS. SECTIONS OF
SNARE WILL BE PLACED ACROSS THE ENTRANCE
TO FLAX POND TO PREVENT RE-
OILING. USFWS AND NYS DEC HAVE SET UP POSTS TO
OBSERVE PIPING PLOVER
IN WEST MEADOW BEACH, OLD FIELD POINT, MCALISTER PARK,
AND FLAX POND.
OILED PIPING PLOVERS OBSERVED ON 29MAR01 ARE STILL BEING
MONITORED.
ESTIMATE CLEAN UP OPS UNTIL 31MAR01.
D. LETTER OF DESIGNATION WAS
ISSUED TO SEABOARD SHIPPING CORP., A
SUBSIDIARY OF MORAN SERVICES CORP.
FEDERAL FUND (FPN B01105) HAS BEEN
OPENED TO RECOVER AGENCY COSTS. CEILING
REQUESTS HAVE BEEN RECEIVED
FROM NYS DEC AND THE DEPARTMENT OF INTERIOR
(USFWS).
E. NO UPDATE ON NUMBER OF WILDLIFE IMPACTED. 13 WATERFOWL
HAVE
PERISHED, OVER 100 HAVE BEEN TARRED. NYS DEC AND USFWS ARE
MONITORING
THE SITUATION CLOSELY.
F. THUS FAR, COST OF CLEAN UP HAS REACHED
$705,000 AS OF 29 MARCH.
TOTAL PERSONNEL ON SCENE WAS 127, 125 CONTRACTORS,
9 CG, 12 NYS DEC, 3
USFWS, AND 7 TOWN OF BROOKHAVEN PERSONNEL.
G. PUBLIC
AFFAIRS
1. NO REQUEST FOR INTERVIEWS ON 30MAR01.
2. MORAN TOWING HAS
PROVIDED A PHONE NUMBER FOR CLAIMS RELATED TO THE
SPILL. IT IS
1-888-422-2524.
B. CURRENT WEATHER: 39F, N WINDS 17 KNOTS, SCATTERED
SHOWERS.
C. RESPONSIBLE PARTY: T/B RHODE ISLAND
SEABOARD SHIPPING SERVICES CORP.
TWO GREENWICH
PLAZA
GREENWICH, CT 06830
SEABOARD SHIPPING
SERVICES CORP. IS A SUBSIDIARY OF MORAN SERVICES
CORP.
2. ACTION TAKEN:
A.
300600R MAR 01 GROUP/MSO PERSONNEL ARRIVED ON SCENE AT UNIFIED
COMMAND POST
LOCATED IN CEDAR BEACH, NY FOR PRE-OPS MEETING WITH STATE
RESPONDERS.
B.
0630 ALL SCAT TEAMS CONDUCTED AN ASSESSMENT OF THEIR AREAS
ACCOMPANIED BY
ONE CONTRACTOR TO PICK UP ANY LARGE CLUMPS OF OIL. NRC
PERSONNEL BEGAN
CLEAN UP OF FLAX POND, PORT JEFFERSON HARBOR, AND WEST
MEADOW BEACH.
C.
1100 GRU/MSO LIS, NRC, STATE, AND USFWS CONFERRED ON STATUS OF
SHORELINE
ASSESSMENT AND CLEAN UP.
D. 1700 GRU/MSO LIS, NRC, STATE, AND USFWS
CONFERRED ON STATUS OF
CLEAN UP. AREAS IN OLD FIELD BEACH, PORT JEFFERSON
HARBOR, AND FLAX
POND WERE IDENTIFIED AS AREAS IN GREATEST NEED OF CLEAN UP
CREWS. RE-
OILED SECTION OF WEST MEADOW BEACH, CRANE NECK, AND MCALLISTER
PARK
WILL BE REVALUATED BY ASSESSMENT TEAMS AND CONTRACTORS. PLANS
WERE
MADE TO RE-CONVENE AT UNIFIED COMMAND POST AT CEDAR BEACH AT
0630
FOLLOWING MORNING TO CONTINUE CLEAN UP.
3. CO'S ASSESSMENT:
A. CLEAN
UP WORKFORCE INCREASED TO HIGHEST LEVEL SINCE BEGINNING OF
INCIDENT. GOOD
PROGRESS WAS MADE TODAY DESPITE HEAVY WIND, RAIN, AND
SOME RE-OILING. NO
FURTHER WILDLIFE IMPACTED TODAY
B. MSFO TO MONITOR CLEANUP.
4. CASE
PENDS.
BT