2001-Mar-26 |
P 270023Z MAR 01
FM COGARD MSD CORAM NY
TO CCGDONE BOSTON MA//M/CC//
COMDT
COGARD WASHINGTON DC//G-MRO//
COMCOGARD NPFC WASHINGTON DC
COMCOGARD MLC
LANT NORFOLK VA//FCP//
COGARD MSO LONG ISLAND SOUND NEW HAVEN
CT
COMCOGARDGRU LONG ISLAND SOUND NEW HAVEN CT
COMCOGARDGRU MORICHES
NY
BT
UNCLAS //N16465//
SUBJ: POLREP FOUR, MINOR, OIL WASHING ON 25 MILES
OF BEACH, NORTH
SHORE, LONG ISLAND, MC01003947.
1. SITUATION:
A. GROUP/MSO
LONG ISLAND SOUND CONTINUING INVESTIGATION AND MONITORING
CLEANUP OF BLACK
CLUMPS OF OIL, WHICH HAVE WASHED UP ON THE BEACHES
FROM STONY BROOK, NY, TO
WADING RIVER, NY. NATIONAL RESPONSE
CORPORATION (NRC) HAS BEEN CONTRACTED.
CLEAN UP EFFORTS RESUMED AT
0600. OPERATIONS WERE CONCENTRATED IN WEST
MEADOW BEACH, STONY BROOK,
NY, CEDAR BEACH, MT SINAI, NY, PORT JEFFERSON,
NY, AND ROCKY POINT,
NY.
B. CLEANED AREAS WITHIN PORPOISE CHANNEL IN STONY
BROOK HARBOR, CLEAN
UP COMPLETE. WEST MEADOW BEACH AREAS WERE CLEANED
AGAIN,
APPROXIMATELY 30% REMAINS UNCLEANED. AREAS FROM CRANE NECK POINT
AND
FLAX POND REMAIN TO BE CLEANED. OLD FIELD POINT CLEANED FROM OLD
FIELD
LIGHT TO MOUNT SINAI HARBOR. AREA FROM OLD FIELD POINT WEST TO
CRANE NECK
REMAINS TO BE CLEANED. SE END OF PORT JEFFERSON HARBOR
STILL REMAINS TO BE
CLEANED, CONTRACTOR PLANS TO USE STEAM ON AFFECTED
ROCKS ON 27MAR01.
WEATHER HAMPERED CLEAN UP EFFORTS. A TOTAL OF 15
MILES OUT OF THE
ORIGINALLY ESTIMATED 25 MILES HAVE BEEN CLEANED.
C. PLANS FOR 27MAR01
CONSIST OF RE-EVALUATION OF AFFECTED AREAS.
CLEAN UP EFFORTS WILL BE
CONCENTRATED IN PORT JEFFERSON HARBOR, FLAX
POND, AND ROCKY POINT, NY. GOAL
FOR 27MAR01 IS TO HAVE ALL AFFECTED
AREAS CLEANED OF OIL, BUT ESTIMATE CLEAN
UP OPS UNTIL 28MAR01.
D. SAMPLES OF OIL FROM MARINE SAFETY LAB HAVE
INDICATED A POSITIVE
MATCH BETWEEN THE SPILL & THE T/B RHODE ISLAND.
E.
FEDERAL FUND (FPN B01105) HAS BEEN OPENED TO RECOVER AGENCY COSTS.
REQUEST
NPFC ISSUE A LETTER OF DESIGNATION TO RESPONSIBLE PARTY.
F. SO FAR SEVEN
WATERFOWL HAVE PERISHED, AND THIRTY HAVE BEEN TARRED.
NY STATE DEPARTMENT OF
ENVIRONMENTAL CONSERVATION AND U.S. FISH AND
WILDLIFE SERVICES ARE
MONITORING THE SITUATION.
G. THUS FAR, COST OF CLEAN UP HAS REACHED
$227,000. TOTAL PERSONNEL
ON SCENE WAS 134; 93 CONTRACTORS, 15 CG, 13 NYS
DEC, 6 U.S. FISH AND
WILDLIFE, AND 7 TOWN OF BROOKHAVEN PERSONNEL.
H.
PUBLIC AFFAIRS
1. GROUP/MSO AND D1 P.I.A.T. HELD A PRESS CONFERENCE AT 1130
HOSTED
BY TOWN OF BROOKHAVEN SUPERVISOR, JOHN LAVALLE. MR. LAVALLE
OPENED
WITH COMPLIMENTARY COMMENTS ABOUT RESPONSE EFFORTS TO DATE. FOSC
&
SOSC PROVIDED UPDATES OF CLEAN UP EFFORTS AND RESPONDED TO
MEDIA
QUESTIONS. QUESTIONS FOCUSED ON THE T/B RHODE ISLAND.
PRESS
CONFERENCE ATTENDED BY A MAJORITY OF NY TELEVISION AND PRINT MEDIA.
2.
THE NEXT PRESS CONFERENCE IS SCHEDULED FOR 1200 27MAR01.
3. A MEDIA
ADVISORY HAS BEEN RELEASED THIS EVENING NOTIFYING THE
RESULTS OF THE OIL
SAMPLE ANALYSIS WHICH IDENTIFIES THE SOURCE AS THE
T/B RHODE ISLAND.
4.
FOSC PROVIDED DAILY UPDATE TO CONGRESSMAN GRUCCI'S STAFF FOLLOWING
PRESS
CONFERENCE.
B. CURRENT WEATHER: 31F, NW WINDS 5 KNOTS, CLEAR.
C.
RESPONSIBLE PARTY: T/B RHODE ISLAND
MORAN TOWING
AND TRANSPORTATION
#2 GREENWICH PLAZA
GREENWICH, NY 06830
2. ACTION TAKEN:
A. 260600R MAR 01 GROUP/MSO
PERSONNEL ARRIVE ON SCENE AT NRC COMMAND
POST LOCATED IN CEDAR BEACH, NY FOR
PRE-OPS MEET TING WITH STATE AND
LOCAL RESPONDERS.
B. 0630 NRC PERSONNEL
BEGIN SHORELINE ASSESSMENT AND CLEAN UP OF
KNOWN AFFECTED AREAS IN WEST
MEADOW BEACH, CEDAR BEACH, PORT
JEFFERSON, AND HEROD POINT.
C. 1130
GRU/MSO LIS, NRC, STATE, AND LOCAL AGENCIES CONFER ON STATUS
OF SHORELINE
ASSESSMENT AND CLEAN UP.
D. 1700 GRU/MSO LIS, NRC, STATE, AND LOCAL
AGENCIES CONFER ON STATUS
OF CLEAN UP. AREAS IN FLAX POND, PORT JEFFERSON
HARBOR, WEST MEADOW
BEACH, AND ROCKY POINT, NY ARE IDENTIFIED AS AREAS OF
HIGHEST
CONCENTRATION OF OIL. PLANS ARE
MADE TO RE-CONVENE AT NRC COMMAND
POST AT CEDAR BEACH AT 0600
FOLLOWING MORNING TO CONTINUE CLEANUP.
3. CO'S
ASSESSMENT:
A. PROGRESS HAMPERED BY ACCUMULATING SNOW, BUT PROGRESS WAS
STILL
MADE. ESTIMATED 60% OF IMPACTED BEACH WAS CLEANED. EXPECT TO
MAKE
SIGNIFICANT PROGRESS ON 27MAR01 DUE TO FAVORABLE WEATHER
FORECAST.
LOCAL POLITICAL OFFICIALS ARE SATISFIED WITH RESPONSE.
B. MSFO TO
MONITOR CLEANUP.
4. CASE PENDS.
BT
NNNN